BUILDING CONSTRUCTION PROJECT REPORT
DEPARTMENT OF BUILDING TECHNOLOGY
GROUP 2
GENERAL INFORMATION:
GROUP LEADER MATRIC NO
OLANRENWAJU GABRIEL F/ND/15/3510007
GROUP MEMBERS MATRIC NO
ONAMADR AYOMIDE F/ND/15/35100
WELEZE EDMOND F/ND/15/3510041
ADEBOYE ALEX F/ND/15/3510047
JINODU BARAKAT F/ND/15/3510028
APATA MOYOSORE F/ND/15/3510030
FALOLA TOBI F/ND/15/3510024
ADEGBENRO TOHEEB F/ND/15/3510013
JIMOH ABDUL AZEEZ F/ND/15/3510034
SAMUEL TONDE F/ND/15/3510026
THE SITE
Location Of The Site
The site is located at 4, HARVEY ROAD, YABA, LAGOS.
THE PURPOSE OF CONSTRUCTION
Building A Permanent Secretariat For West African College Of SurgeonsSAFETY OFFICE
We Met The Engineer who took us around the site for observation
MACHINERY
There was a CRANE for transferring materials to the top of the building
A temporary power source for the engines
BUILDING COMPONENTS
THE FOUNDATION: It was a pile foundation.
THE COLUMNS: The type of column used was a circular column.
THE WALLS
THE WINDOW AND DOOR OPENINGS
THE SITE OFFICE
STORAGE FACILITIES
The storage facility was made of PAN for storing cements, blocks, sand and iron
OTHER THINGS WE SAW ON SITE
* A changing room for the site workers
* An A.C duct/A.C vent
* A netting for preventing debris from entering the neighbors building
* Some CAUTION signs